International trade in heavy, outsized equipment is surging. Infrastructure projects, renewable energy installations and large‑scale construction depend on moving unusual cargo—transformers, turbines, boilers, prefabricated modules—that do not fit in standard containers. Choosing a Project Cargo Logistics Company with the right know‑how can transform a complex move into a smooth operation. At Sigma Logistics, we leverage our experience, networks and compliance expertise to help Egyptian exporters and importers navigate this challenging niche. This guide explains what counts as project cargo, how to prepare for an oversized shipment and what makes Sigma a trusted partner.

What Counts as Project Cargo & OOG (and Why It’s Different)

Project cargo involves large, heavy or high‑value items that often cannot be disassembled. These pieces exceed the dimensions of conventional freight containers and require specialized handling equipment, route planning and permits.

OOG vs heavy‑lift vs project logistics: clear definitions

Out‑of‑gauge (OOG) cargo refers to items with unwieldy booms or protrusions that do not fit into standard shipping containers. Examples include luxury coaches, trailers, aircraft parts, wind turbine blades and large machinery. Because they exceed container dimensions and weight limits, OOG shipments need heavy‑duty equipment and careful lashing to prevent damage. Heavy‑lift cargo focuses on items too heavy for conventional cranes—think generators weighing hundreds of tons. Project logistics covers the engineering, planning and execution of entire projects, often involving multiple pieces of OOG and heavy‑lift cargo with complex staging.

Common cargo types & risk profile

Industries such as oil & gas, construction, mining and renewable energy frequently rely on project cargo. The Ship4wd guide notes that project cargo items may weigh from over a ton to thousands of tons, with heights exceeding 50–100 metres ship4wd.com. Moving these “indivisible” items requires coordination across modes and continuous risk assessment ship4wd.com. Poor planning can lead to delays, fines or accidents.

Egypt context: key corridors & ports (Alexandria, Dekheila, Damietta, Sokhna)

Egypt sits at the crossroads of Africa, Europe and the Middle East, and the government is investing heavily in port expansions and multimodal logistics corridorsmordorintelligence.com. Major ports—including Alexandria, Dekheila, Damietta and Sokhna—handle breakbulk and heavy‑lift vessels. Sigma works closely with these ports to secure berth windows, cranes and storage for over‑dimensional cargo. When evaluating a Project Cargo Logistics Company, ensure they have relationships with local port authorities and understand the road infrastructure connecting factories, ports and project sites.

Pre‑Engineering & Feasibility: Getting the Numbers Right

Successful project cargo shipments begin long before the cargo leaves the factory. Feasibility studies identify constraints and ensure accurate data.

Verified dimensions, gross weight, centre of gravity, lifting points, drawings

Detailed engineering documents—dimensional drawings, weights and centre of gravity certificates—allow logistics planners to select appropriate lifting equipment and transport modes. Without accurate figures, carriers may reject the load or require costly re‑work. Providing detailed photos and engineering drawings at the quotation stage helps Sigma’s engineers design a safe lifting plan.

Route survey essentials: bridge/overpass clearance, turning radius, roadworks, curfews

Route surveys evaluate roads, bridges, overpasses and corners to ensure the cargo will fit. The Marine Insight article stresses the importance of avoiding busy roads and ensuring there is enough clearance above and on either side of the cargo. Surveys check turning radii, roadworks and curfew restrictions. In Egypt, special permits are required for oversized and overweight vehicles; our team arranges police escorts and coordinates with authorities to schedule convoys during permitted windows. We also monitor planned road works and infrastructure projects that could affect transport.

Site readiness: access roads, crane pads, lay‑down, ground bearing & soil checks

Preparing both origin and destination sites is crucial. Access roads must be widened or reinforced to handle multi‑axle trailers. Lay‑down areas require ground‑bearing assessments, and crane pads must support heavy lifting equipment. Sigma’s project cargo specialists conduct site visits to identify obstacles, design temporary roads or bridges and ensure the receiving site can accept the load.

Permits, Compliance & Risk Management in Egypt

Oversized shipments are regulated. A reliable Project Cargo Logistics Company ensures compliance and minimizes risk.

Oversize/overweight road permits, police escorts, convoy rules & timing windows

Transporting OOG cargo by road requires permits specifying dimensions, weight, routes and timing. Escorts may be mandatory, and convoy speed may be limited to avoid accidents. Our operations team applies for permits, arranges escorts and plans departure times to align with local curfews.

Customs pathway & pre‑arrival data (ACI/NAFEZA), temporary import & re‑export options

Egypt’s Advanced Cargo Information (ACI) and NAFEZA platforms require pre‑arrival documentation for all imported cargo. For temporary imports or equipment to be re‑exported after a project, careful management of carnet or temporary admission procedures avoids unnecessary duties. Sigma’s customs experts handle ACI filings, ensure HS codes and documentation are accurate and advise on temporary import options.

HSE plans, RAMS/method statements, third‑party liability & cargo insurance

Health, Safety & Environment (HSE) plans outline safe lifting, transport and emergency procedures. Risk assessments and method statements (RAMS) identify hazards and mitigation steps. Adequate insurance—covering third‑party liability, cargo damage and delay—is essential. We work with insurers to secure all‑risks coverage and create contingency plans for bad weather, port congestion and political events.

Transport & Handling Strategy: Choosing the Right Mode

The mode of transport depends on cargo dimensions, weight, destination and schedule.

Breakbulk/MPP vs Ro‑Ro vs container FR/OT vs charter: selection criteria

  • Breakbulk / Multi‑Purpose Vessels (MPPs): Suitable for heavy and oversized items loaded individually using ship or shore cranes.
  • Ro‑Ro (Roll‑on/Roll‑off): Ideal for wheeled cargo or items placed on mafi trailers rolled onto the vessel.
  • Flat‑rack or open‑top containers: For cargo slightly exceeding standard container heights or widths; they allow side or top loading and provide better protection from the elements.
  • Chartered vessels or barges: Needed for very large projects or remote destinations without scheduled service.

Sigma evaluates each project’s requirements and selects the most cost‑effective mode. We may combine modes—for example, using barges to move heavy modules along the Nile before transloading onto ocean vessels.

Port handling: cranes, SPMTs/multi‑axle trailers, rigging plans, lashing & securing

Cargo arriving at port requires coordination with terminal operators for cranes or Self‑Propelled Modular Transporters (SPMTs). Rigging plans ensure safe lifting; lashing and securing keep the cargo stable during sea voyages. Marine Insight highlights that improper lashing can damage other cargo and cause accidents. Sigma provides detailed lift and rigging plans, hires appropriate equipment and supervises operations.

Weather windows, stowage plans, barge/rail options & contingency routing

Weather delays can derail schedules. We monitor meteorological reports and plan around seasonal winds or storms. Stowage plans consider vessel stability and how to position oversized cargo on deck. When roads are unsuitable, we explore barges or rail transport. Contingency routes are identified in case of construction, accidents or security issues.

Contracts, Incoterms & Commercials for Project Moves

Contracts for project cargo require clarity on responsibilities and costs.

Best‑fit Incoterms for oversized cargo (EXW/FCA vs CIP/CIF vs DAP/DPU/DDP)

Incoterms define which party arranges and pays for transport, insurance and customs clearance. For project cargo, terms like FCA (Free Carrier) or FOB (Free On Board) may offer shippers more control, while CIP (Carriage and Insurance Paid) or DAP (Delivered At Place) shift responsibility to the logistics provider.

Cost build‑up: surveys, permits, escorts, crane hire, storage, port charges, demurrage/detention

A detailed quote should itemize costs: engineering surveys, route studies, permit fees, police escorts, crane hire, storage, port handling, insurance and potential demurrage/detention. Transparency is critical so you can compare proposals fairly. Sigma offers breakdowns and helps clients optimize total landed costs, rather than focusing only on freight rates.

SLAs & KPIs: lead time, damage/claims rate, handover readiness, milestone adherence

Service level agreements (SLAs) outline expectations for each stage of the project, while key performance indicators (KPIs) track performance. A rootly article explains that SLAs define service expectations and KPIs monitor whether those expectations are met. Important KPIs for project cargo include on‑time delivery, damage or claims rate and readiness of cargo handover. We include these metrics in our contracts to ensure accountability.

Execution Timeline & Control Tower

Critical path with milestones: factory readiness → port operations → inland delivery → site handover

Project cargo logistics follows a critical path: verifying factory readiness, coordinating pre‑carriage to port, handling port operations (loading, customs, documentation), sea transit, offloading, inland delivery and final site handover. Delays at one stage ripple through the schedule. Our project managers map milestones and monitor progress.

Stakeholder matrix: shipper, EPC, Sigma operations, carriers, port authorities, police/escorts

Multiple stakeholders—from equipment manufacturers and engineering, procurement & construction (EPC) contractors to carriers, port authorities and police escorts—must be aligned. We maintain a stakeholder matrix, assigning responsibilities and communication channels to keep everyone informed.

Live visibility: status gates, proof of delivery/arrival, exception management & escalation

Real‑time visibility tools (control towers) track shipments, document status updates (departed factory, arrived port, loaded vessel, customs cleared) and flag exceptions. Rapid escalation ensures prompt corrective action. Sigma provides clients with dashboards and reporting so they can monitor progress, anticipate delays and manage expectations.

RFP / Quotation Checklist for Shippers

Shippers preparing to tender a project cargo move should include:

Mandatory data: dimensions, weights, centre of gravity, drawings/photos, lifting points, CoG certificates

Providing accurate technical data allows carriers and logistics providers to design the right transport solution. Photos and drawings help identify protrusions or obstacles.

Origin/destination constraints: site access, lay‑down, crane availability, delivery windows

Describe access roads, turning radii, overhead clearances, available cranes and any curfews or shutdown windows at destination sites. This ensures your Project Cargo Logistics Company can plan appropriate equipment and timing.

Compliance & documents: permits needed, HS codes, packing specs, insurance requirements

List applicable HS codes for customs, any hazardous goods classifications, packing specifications (e.g., lifting points, saddle supports) and requested insurance coverage. Indicate whether cargo will be imported permanently or temporarily re‑exported.

How Sigma Executes Project Cargo in Egypt

End‑to‑end engineering & permit management

At Sigma Logistics, we offer a turnkey solution for project cargo. Our engineers review drawings, calculate weights and centre of gravity and perform route surveys. We handle oversize permit applications, police escort coordination and lay‑down area preparation.

Port heavy‑lift & inland OOG execution with vetted partners

We maintain partnerships with port operators, crane companies, SPMT providers and specialised heavy‑haul carriers. Our team oversees lifting and lashing plans, ensuring cargo is secured properly. Inland moves use multi‑axle trailers or SPMTs suited to the cargo’s weight and dimensions.

Control‑tower reporting, risk mitigation & claims handling

Our project control tower offers real‑time visibility, status updates and KPI reporting. We conduct risk assessments, implement contingency plans for weather or route changes and handle insurance claims if issues arise. Our approach helps customers meet tight project schedules while minimizing risk.


FAQ

How long do road permits take in Egypt?
Processing time varies by cargo size and route. It’s best to apply at least two weeks in advance, allowing authorities to review route surveys and schedule escorts. Sigma helps clients navigate the process.

What defines OOG vs breakbulk cargo?
OOG cargo exceeds standard container dimensions and may require flat‑rack or open‑top containers or breakbulk carriers. Breakbulk cargo includes any freight loaded individually (bags, barrels, crates) rather than in containers but can be within size limits; project cargo often involves OOG and heavy‑lift items moved together.

How can I avoid demurrage/detention on project cargo?
Provide accurate cargo dimensions and paperwork to avoid customs delays. Secure appointments with ports and carriers, and coordinate timely delivery and pickup to reduce waiting time. Working with an experienced Project Cargo Logistics Company like Sigma ensures planning and communication, helping you avoid unnecessary fees.


At Sigma Logistics, we understand the unique challenges of moving oversized and out‑of‑gauge cargo. By combining engineering expertise, robust local networks and a focus on compliance, we deliver safe, efficient project cargo solutions across Egypt and beyond. If you’d like to learn more about our capabilities or discuss an upcoming project, explore our international freight forwarding, international shipping agency and specialized international freight services—or simply contact us to start planning your next move. We look forward to being your trusted partner.